{"id":632174,"date":"2022-11-22T20:39:25","date_gmt":"2022-11-22T20:39:25","guid":{"rendered":""},"modified":"2022-11-22T21:23:32","modified_gmt":"2022-11-22T21:23:32","slug":"petroleo-y-gas-2022-11-22-con-atraso-cnh-aprueba-programa-de-trabajo-total-energies-sobre-contrato","status":"publish","type":"post","link":"https:\/\/quesignificamx.com\/energy21\/petroleo-y-gas-2022-11-22-con-atraso-cnh-aprueba-programa-de-trabajo-total-energies-sobre-contrato\/","title":{"rendered":"Con atraso, CNH aprueba programa de trabajo a Total Energies sobre contrato petrolero"},"content":{"rendered":"<div><img decoding=\"async\" src=\"https:\/\/quesignificamx.com\/energy21\/wp-content\/uploads\/2024\/05\/CNH-Edificio_5.jpg\" ><\/div>\n<div>\n<div>\n<p><o:p><\/o:p>A pocos d\u00edas de concluir el 2022, la <strong>Comisi\u00f3n Nacional de Hidrocarburos (CNH) <\/strong>dio su visto bueno al Programa de Trabajo 2022 y el Presupuesto asociado de Total Energies sobre el contrato <strong>CNH-R03-L01-AS-CS-06\/2018<\/strong>. <o:p><\/o:p><\/p>\n<p>&nbsp;<\/p>\n<p>Pese a los atrasos del \u00f3rgano regulador para aprobar el programa de trabajo, el contratista llev\u00f3 a cabo actividades generales, geof\u00edsicas, geol\u00f3gicas, de perforaci\u00f3n y seguridad, salud medio ambiente durante el a\u00f1o. <o:p><\/o:p><\/p>\n<p>&nbsp;<\/p>\n<p>Adem\u00e1s, de que en la propuesta presentaba este martes, registr\u00f3 un aumento presupuestario, pasando de 3.20 millones de d\u00f3lares aprobados en el plan vigente a <strong>17.33 millones de d\u00f3lares en la actualizaci\u00f3n<\/strong>. <o:p><\/o:p><\/p>\n<p>&nbsp;<\/p>\n<p>H\u00e9ctor Moreira Rodr\u00edguez, comisionado de la CNH, <strong>cuestion\u00f3 que el programa de trabajo haya sido llevado a la sesi\u00f3n debido a que se trata de actividades realizadas en este a\u00f1o<\/strong>, mismo que esta por concluir. <o:p><\/o:p><\/p>\n<p>&nbsp;<\/p>\n<blockquote><p><\/p>\n<p>\u201cEl contratista present\u00f3 el presupuesto el noviembre de 2021, muy a tiempo de un programa del 2022, lo presentaron cuatro veces y habr\u00eda que ver porqu\u00e9\u201d, coment\u00f3. <o:p><\/o:p><\/p>\n<p><\/p><\/blockquote>\n<p>&nbsp;<\/p>\n<p>Rodrigo Hern\u00e1ndez Ordo\u00f1ez de la Unidad T\u00e9cnica de Exploraci\u00f3n y su Supervisi\u00f3n, refiri\u00f3 que el caso no hab\u00eda sido llevado a sesi\u00f3n con \u00f3rgano de gobierno debido a que el contratista ten\u00eda <strong>problemas con la descripci\u00f3n de los costos, adem\u00e1s de que se analiz\u00f3 el plan de exploraci\u00f3n<\/strong>. <o:p><\/o:p><\/p>\n<p>&nbsp;<\/p>\n<p>Al respecto, el comisionado N\u00e9stor Mart\u00ednez Romero, se\u00f1al\u00f3 que no las negativas no fueron congruentes puesto que las actividades consideradas en el plan de exploraci\u00f3n fueron realizadas. <o:p><\/o:p><\/p>\n<p>&nbsp;<\/p>\n<blockquote><p><\/p>\n<p>\u201cSi estamos aprobando un programa de trabajo de lo que ya pas\u00f3 es importante porque si no lo hici\u00e9ramos as\u00ed, parar\u00edamos la actividad\u201d, dijo durante la 84\u00aa. Sesi\u00f3n Extraordinaria del \u00f3rgano regulador. <o:p><\/o:p><\/p>\n<p><\/p><\/blockquote>\n<p>&nbsp;<\/p>\n<p>Finalmente, Agust\u00edn D\u00edaz Lastra, presidente de la Comisi\u00f3n, hizo un llamado al personal de la dependencia para notificar este tipo de situaciones a futuro, destacando que al no estar completo el \u00f3rgano de gobierno, se puede retrasar y complicar la labor de los operadores petroleros en M\u00e9xico.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Comenta y s\u00edguenos&nbsp;<a href=\"https:\/\/twitter.com\/josemartin_mx\">@josemartin_mx<\/a>&nbsp;<a href=\"https:\/\/twitter.com\/energy21mx\">@Energy21Mx<\/a>&nbsp; &nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h3>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;\u00a1Asiste a nuestra pr\u00f3xima mesa de debate de Di\u00e1logos con Energ\u00eda!<\/h3>\n<p>&nbsp;<\/p>\n<p style=\"box-sizing: border-box; margin: 0px; color: rgb(48, 48, 48); font-family: Roboto, serif; font-size: 16px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: start; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255); text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial;\"><img decoding=\"async\" alt=\"DCE-TMEC\" data-entity-type=\"file\" data-entity-uuid=\"dd9b0cf1-c2f5-4d06-a1b2-5c4a57735253\" src=\"https:\/\/energy21.com.mx\/sites\/default\/files\/inline-images\/WhatsApp%20Image%202022-11-16%20at%2012.20.10%20PM.jpeg\" style=\"box-sizing: border-box; border: 0px; vertical-align: middle; max-width: 100%; height: auto;\" \/><\/p>\n<p><span style=\"font-size:10.5pt;<br \/>line-height:107%;font-family:&quot;Segoe UI&quot;,sans-serif;background:white&#8221;><o:p><\/o:p><\/span><\/p>\n<p><\/div>\n<\/div>\n<div>\n<div>standard<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A pocos d\u00edas de concluir el 2022, la Comisi\u00f3n Nacional de Hidrocarburos (CNH) dio su visto bueno al Programa de Trabajo 2022 y el Presupuesto asociado de Total Energies sobre el contrato CNH-R03-L01-AS-CS-06\/2018. &nbsp; Pese a los atrasos del \u00f3rgano regulador para aprobar el programa de trabajo, el contratista llev\u00f3 a cabo actividades generales, geof\u00edsicas, [&hellip;]<\/p>\n","protected":false},"author":37,"featured_media":642506,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27365],"tags":[27456,29067],"class_list":["post-632174","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-petroleo-y-gas","tag-cnh","tag-totalenergies"],"_links":{"self":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/posts\/632174","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/users\/37"}],"replies":[{"embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/comments?post=632174"}],"version-history":[{"count":0,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/posts\/632174\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/media\/642506"}],"wp:attachment":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/media?parent=632174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/categories?post=632174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/tags?post=632174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}