{"id":631366,"date":"2022-09-22T19:10:21","date_gmt":"2022-09-22T19:10:21","guid":{"rendered":""},"modified":"2022-09-22T19:59:05","modified_gmt":"2022-09-22T19:59:05","slug":"petroleo-y-gas-2022-09-22-allseas-gana-contrato-para-construir-gasoducto-puerta-al-sureste","status":"publish","type":"post","link":"https:\/\/quesignificamx.com\/energy21\/petroleo-y-gas-2022-09-22-allseas-gana-contrato-para-construir-gasoducto-puerta-al-sureste\/","title":{"rendered":"Allseas gana contrato para construir gasoducto \u201cPuerta al Sureste\u201d"},"content":{"rendered":"<div><img decoding=\"async\" src=\"https:\/\/quesignificamx.com\/energy21\/wp-content\/uploads\/2024\/05\/allseas.jpg\" ><\/div>\n<div>\n<div>\n<p class=\"MsoNormal\"><o:p><\/o:p><\/p>\n<p class=\"MsoNormal\">TC Energ\u00eda&nbsp;le otorg\u00f3 a <strong>Allseas un contrato para la construcci\u00f3n del gasoducto \u201cPuerta al Sureste\u201d<\/strong> en alta mar que entrega gas natural al sureste de M\u00e9xico.<o:p><\/o:p><\/p>\n<blockquote><p><\/p>\n<p class=\"MsoNormal\">\u201cNuestros buques de \u00faltima generaci\u00f3n instalar\u00e1n el gasoducto de 36 pulgadas, que recorrer\u00e1 aproximadamente 700 kil\u00f3metros al sur a lo largo de la costa desde Tuxpan, conectando los puertos de Coatzacoalcos y Dos Bocas\u201d, asegur\u00f3 la compa\u00f1\u00eda en un comunicado. <o:p><\/o:p><\/p>\n<p><\/p><\/blockquote>\n<p class=\"MsoNormal\">La infraestructura en cuesti\u00f3n ser\u00e1 el primer proyecto de gas natural que surge de una nueva alianza estrat\u00e9gica entre TC Energy y la empresa estatal de servicios p\u00fablicos de M\u00e9xico, Comisi\u00f3n Federal de Electricidad (CFE).<o:p><\/o:p><\/p>\n<blockquote><p><\/p>\n<p class=\"MsoNormal\">\u201cAllseas se complace en desempe\u00f1ar un papel clave en este proyecto estrat\u00e9gico, que atender\u00e1 la creciente necesidad de un suministro de energ\u00eda seguro, confiable y asequible en la regi\u00f3n sureste de M\u00e9xico\u201d, a\u00f1adi\u00f3.<o:p><\/o:p><\/p>\n<p><\/p><\/blockquote>\n<p class=\"MsoNormal\">Se espera que el gasoducto comience a fines de 2023, con la tuber\u00eda en servicio a mediados de 2025.<o:p><\/o:p><\/p>\n<p class=\"MsoNormal\">\u201cPuerta al Sureste\u201d es el segundo gasoducto de Allseas en M\u00e9xico. <o:p><\/o:p><\/p>\n<p class=\"MsoNormal\">En 2017 instal\u00f3 el gasoducto Sur de Texas-Tuxpan de 685 km de longitud, que traslada el suministro de gas natural desde cuencas en Texas hasta el sur de M\u00e9xico.<\/p>\n<p class=\"MsoNormal\"><o:p><\/o:p><\/p>\n<p class=\"MsoNormal\">&nbsp;<\/p>\n<h3 class=\"MsoNormal\">Te contamos:&nbsp;<a href=\"http:\/\/energy21.com.mx\/petroleo-y-gas\/2022\/09\/09\/gasoducto-puerta-al-sureste-pone-fin-disputa-entre-tc-energia-y-cfe\">Gasoducto Puerta al Sureste pone fin a disputa entre TC Energ\u00eda y CFE<\/a><\/h3>\n<p class=\"MsoNormal\">&nbsp;<\/p>\n<p class=\"MsoNormal\">De acuerdo con Leonardo Robles, vicepresidente de desarrollo de negocios de TC Energ\u00eda, la obra utilizar\u00e1 la capacidad de transporte del Gasoducto marino sur de Texas para llevar gas natural y abastecer el proyecto del gasoducto del Itsmo de Tehuantepec desde Coatzacoalcos, Veracruz dando acceso a parques industriales a lo largo del corredor multimodal interoce\u00e1nico y a la terminal de licuefacci\u00f3n Previsto para Salina cruz Oaxaca y as\u00ed tener la posibilidad de exportar gas natural y licuado a mercados en el pac\u00edfico.<o:p><\/o:p><\/p>\n<p class=\"MsoNormal\">Desde Coatzacoalcos, el Gasoducto \u201cPuerta al Sureste\u201d continuar\u00e1 su recorrido hasta Para\u00edso, Tabasco conect\u00e1ndose con otros ductos. <o:p><\/o:p><\/p>\n<p class=\"MsoNormal\">Esto asegurar\u00e1 el abasto de gas natural de la Pen\u00ednsula de Yucat\u00e1n contribuyendo a las plantas de generaci\u00f3n de ciclo combinado de la CFE que se encuentren en construcci\u00f3n.<\/p>\n<p class=\"MsoNormal\">&nbsp;<\/p>\n<p class=\"MsoNormal\">Comenta y s\u00edguenos:&nbsp;<a href=\"https:\/\/twitter.com\/Da_Lored0\">@Da_Lored0<\/a>&nbsp;<a href=\"https:\/\/twitter.com\/energy21mx\">@Energy21Mx<\/a>&nbsp;&nbsp;<\/p>\n<p class=\"MsoNormal\">&nbsp;<\/p>\n<h3 style=\"box-sizing: border-box; font-family: Roboto, serif; font-weight: 600; line-height: 1.1; color: rgb(17, 17, 17); margin-top: 11.5px; margin-bottom: 11.5px; font-size: 20px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; letter-spacing: normal; orphans: 2; text-align: start; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; background-color: rgb(255, 255, 255);\">Lee&nbsp;nuestra edici\u00f3n digital&nbsp;correspondiente al mes de Septiembre. Da clic&nbsp;<a href=\"https:\/\/issuu.com\/energy21mx\/docs\/energy21_septiembre_2022\" style=\"box-sizing: border-box; background: transparent; color: rgb(0, 150, 115); text-decoration: underline;\">aqu\u00ed<\/a><\/h3>\n<p><img decoding=\"async\" alt=\"e21\" data-align=\"center\" data-entity-type=\"file\" data-entity-uuid=\"215f8e47-0aca-4220-8f39-01955a1bf3c3\" src=\"https:\/\/quesignificamx.com\/energy21\/wp-content\/uploads\/2024\/05\/e21-septiembre-banner_4.jpg\" \/><\/p>\n<p class=\"MsoNormal\"><o:p><\/o:p><\/p>\n<p class=\"MsoNormal\"><o:p>&nbsp;<\/o:p><\/p>\n<p><\/div>\n<\/div>\n<div>\n<div>standard<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>TC Energ\u00eda&nbsp;le otorg\u00f3 a Allseas un contrato para la construcci\u00f3n del gasoducto \u201cPuerta al Sureste\u201d en alta mar que entrega gas natural al sureste de M\u00e9xico. \u201cNuestros buques de \u00faltima generaci\u00f3n instalar\u00e1n el gasoducto de 36 pulgadas, que recorrer\u00e1 aproximadamente 700 kil\u00f3metros al sur a lo largo de la costa desde Tuxpan, conectando los puertos [&hellip;]<\/p>\n","protected":false},"author":36,"featured_media":642257,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27365],"tags":[27393,28086,29784,28025],"class_list":["post-631366","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-petroleo-y-gas","tag-cfe","tag-gasoducto","tag-gasoducto-puerta-al-sureste","tag-tc-energia"],"_links":{"self":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/posts\/631366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/users\/36"}],"replies":[{"embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/comments?post=631366"}],"version-history":[{"count":0,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/posts\/631366\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/media\/642257"}],"wp:attachment":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/media?parent=631366"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/categories?post=631366"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/tags?post=631366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}