{"id":619605,"date":"2018-09-27T21:25:54","date_gmt":"2018-09-27T21:25:54","guid":{"rendered":""},"modified":"2018-09-27T21:57:24","modified_gmt":"2018-09-27T21:57:24","slug":"renovables-2018-09-27-engie-invertira-111-mdd-para-construir-parque-solar-en-sonora","status":"publish","type":"post","link":"https:\/\/quesignificamx.com\/energy21\/renovables-2018-09-27-engie-invertira-111-mdd-para-construir-parque-solar-en-sonora\/","title":{"rendered":"Engie invertir\u00e1 111 mdd para construir parque solar en Sonora"},"content":{"rendered":"<div><img decoding=\"async\" src=\"https:\/\/quesignificamx.com\/energy21\/wp-content\/uploads\/2024\/05\/panel_solar_ok.jpg\" ><\/div>\n<div>\n<div>\n<p>La compa\u00f1\u00eda <a href=\"https:\/\/www.engie.com\/en\/\">Engie <\/a>construir\u00e1 un <strong>nuevo parque solar fotovoltaico en Sonora<\/strong>, el cual tendr\u00e1 una capacidad de generaci\u00f3n de <strong>130.8 megawatts (MW)<\/strong> y requerir\u00e1 una inversi\u00f3n de <strong>111 millones de d\u00f3lares.<\/strong><\/p>\n<p>Con este proyecto, la firma <strong>alcanzar\u00e1 una capacidad de generaci\u00f3n en el pa\u00eds de mil 55 MW<\/strong>, que representan recursos por <strong>924 millones de d\u00f3lares<\/strong> para levantar <strong>seis <\/strong>parques solares y <strong>dos <\/strong>parques e\u00f3licos en un periodo de <strong>tres <\/strong>a\u00f1os.<\/p>\n<p>El Director General de la Empresa, Fernando Tovar, asegur\u00f3 que se trata de un crecimiento r\u00e9cord de Engie en M\u00e9xico, ya que en <strong>un periodo realmente corto aportar\u00e1n m\u00e1s de un gigawatt de energ\u00eda limpia<\/strong> al servicio de la industria y los hogares.<\/p>\n<p>El parque solar se levantar\u00e1 en Sonora,<strong> en una superficie de 266 hect\u00e1reas<\/strong>, se instalar\u00e1n casi <strong>400 mil paneles fotovoltaicos<\/strong>, que suministrar\u00e1 a <a href=\"https:\/\/www.gerdau.com\/gerdaucorsa\/es\/home\">Gerdau Corsa<\/a>, una de las principales proveedoras de aceros largos en M\u00e9xico.<\/p>\n<p>Este proyecto generar\u00e1 <strong>m\u00e1s de 350 empleos durante la construcci\u00f3n <\/strong>en la zona de influencia, la cual iniciar\u00e1 a finales de este a\u00f1o, y se espera entre en operaci\u00f3n en el<strong> \u00faltimo trimestre del 2019<\/strong>.<\/p>\n<p><em>Con informaci\u00f3n de Notimex.<\/em><\/p>\n<p>Comenta y s\u00edguenos en Twitter: <a href=\"https:\/\/twitter.com\/energy21mx\">@energy21mx<\/a><\/p>\n<p><\/div>\n<\/div>\n<div>\n<div>standard<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>La compa\u00f1\u00eda Engie construir\u00e1 un nuevo parque solar fotovoltaico en Sonora, el cual tendr\u00e1 una capacidad de generaci\u00f3n de 130.8 megawatts (MW) y requerir\u00e1 una inversi\u00f3n de 111 millones de d\u00f3lares. Con este proyecto, la firma alcanzar\u00e1 una capacidad de generaci\u00f3n en el pa\u00eds de mil 55 MW, que representan recursos por 924 millones de [&hellip;]<\/p>\n","protected":false},"author":34,"featured_media":638621,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27364],"tags":[27395,27559,27390,27437,27601,27435],"class_list":["post-619605","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-renovables","tag-energia-solar","tag-energias-renovables","tag-engie","tag-generacion-electrica","tag-parque-solar","tag-sonora"],"_links":{"self":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/posts\/619605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/users\/34"}],"replies":[{"embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/comments?post=619605"}],"version-history":[{"count":0,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/posts\/619605\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/media\/638621"}],"wp:attachment":[{"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/media?parent=619605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/categories?post=619605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/quesignificamx.com\/energy21\/wp-json\/wp\/v2\/tags?post=619605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}